Laboratory furniture project acceptance criteria

(A) the technical specifications and requirements:

1, as described in the project plan included economic, technical indicators;

2, the other pointers according to the annex to the present contract implementation.

(Ii), b must be strictly in accordance with design drawings and issued by the State for installation specifications, procedures and standards for the construction, they receive a site representative oversight.

(C) and works in compliance with the relevant specifications and design, and follow the contract product in storage. Free do not meet these requirements by party b is responsible for rework until it reaches the requirements. B rework time shall be included in the overall duration.